![]() |
![]() |
|
|
****JavaScript
based drop down DHTML menu generated by NavStudio. (OpenCube Inc. -
http://www.opencube.com)****
| ||
What is Design-Build?Throughout the Multi-Centre process, the most common question has been "How are you going to keep costs in line?" Early in the process, both the City and CRD heard the concerns of residents regarding project costs and wanted to ensure the project is completed in a cost-efficient and cost-responsible manner. The City and CRD opted to employ the Design-Build method of construction. Put simply, Design Build lays out the scope of the project and defines the price of a project before construction starts. It is designed to keep costs on track while also accelerating the construction timeline. For a more detailed look at the Design-Build process, click here. LinksYou may want to visit a number of websites devoted to the Design-Build method of construction. The Canadian Design-Build Institute The City and CRD contracted MHPM to lead this process on its behalf. |
|
Quick Links |
This site is ideal in Internet Explorer 6 or better with
javascript operational. |
||